So, Finally I have spliced together some pictures. This is a series at intervals of several days each. Just a sequence of start to present. Still a good deal of work to do.
Click on the image to get rid of the window bars.
First picture is the initial condition before I moved the entrance to the microscope room.
Lab Build 1.jpg
Second picture, I have started to install the cabinets that I picked up at the local surplus store.
Lab Build 2.jpg
Third Picture, I am hanging the insulation and preparing for the dry wall.
Lab Build 3.jpg
Dry wall up and ready to hang cabinets.
Lab Build 4.jpg
Cabinets and Counters installed. Counter tops were made from 2 by 4 stud lumber glued and clamped. The surface was planed, sanded and oiled.
Lab Build 5.jpg
More to do. Much more.
But the big jobs are done.
John